Pricing estimates

An annual price book review checklist

A yearly plumbing price book review in six parts: labor, materials, time standards, win rates, overhead and wording, with a one-week schedule.

AssistCall research teamPublished Reviewed by Faruque Amin, VP of Sales and Marketing7 min read

On this page
  1. Why a yearly review matters
  2. Pick the right time of year
  3. Part 1: labor
  4. Part 2: materials
  5. Part 3: time standards
  6. Part 4: win rates and option mix
  7. Part 5: overhead, vehicles and fees
  8. Part 6: wording, incentives and compliance
  9. Example: what one review turned up
  10. Who owns what
  11. Common findings and what to do
  12. Run it in one week
  13. Between annual reviews
  14. Frequently asked questions
  15. References
Pricing estimates: An annual price book review checklistArticle coverPRICING ESTIMATESAn annual price bookreview checklistAva for PlumbersInsightsPricing estimates: An annual price book review checklistArticle coverPRICING ESTIMATESAn annual price bookreview checklistAva for Plumbers

Key takeaways

  • Review the whole price book once a year, ideally in your slower season, and spot-check high-volume tasks every quarter.
  • Recalculate the loaded labor rate first; most other prices depend on it.
  • Compare time standards and win rates with real job data, not memory, and fix the tasks that are furthest off.
  • Clean up descriptions, remove expired incentive claims and roll out the new book on one date everywhere.

Why a yearly review matters

A price book is a model of your business: what each task takes, what it costs and what customers will pay. Every month, reality drifts away from that model. Wages rise, suppliers change prices, techs get faster at some jobs and slower at others, and new products replace old ones. Without a regular review, the book slowly stops describing your business and starts describing the business you were when you last updated it.

The cost of skipping a year is easy to miss because it arrives quietly. No single job looks wrong; each one is just a little thinner than it should be. Techs notice first, when they start discounting to make an old price fit a bigger job, or when customers question a description that no longer matches the product. By the time the owner notices in the accounts, a year of margin is already gone.

Use the checklist below once a year. It is organized in six parts, and most shops can complete it in a week with a little preparation.

Pick the right time of year

Employment at plumbing, heating and AC contractors follows a seasonal pattern. In 2025 it rose from 1,293,700 in January to 1,335,400 in July before easing to 1,317,700 in December, and in 2026 it climbed from 1,305,900 in January to 1,357,800 in August[1]. The quieter months, usually after the holidays and before spring, are the best time to review prices, train the team on changes and update the website before demand picks up.

Employment at plumbing, heating and AC contractorsNot seasonally adjusted. 2026 figures are preliminary.
Employment at plumbing, heating and AC contractorsLine chart. Jan 2025: 1,294 thousand employees; Jul 2025: 1,335 thousand employees; Dec 2025: 1,318 thousand employees; Jan 2026: 1,306 thousand employees; Aug 2026: 1,358 thousand employees.1,280 thousand employees1,300 thousand employees1,320 thousand employees1,340 thousand employees1,360 thousand employeesJan 2025Dec 2025Aug 2026Jan 2025: 1,294 thousand employeesJul 2025: 1,335 thousand employeesDec 2025: 1,318 thousand employeesJan 2026: 1,306 thousand employeesAug 2026: 1,358 thousand employees1,358 thousand employees1,294 thousand employeesEmployment at plumbing, heating and AC contractorsLine chart. Jan 2025: 1,294 thousand employees; Jul 2025: 1,335 thousand employees; Dec 2025: 1,318 thousand employees; Jan 2026: 1,306 thousand employees; Aug 2026: 1,358 thousand employees.1,280 thousand employees1,300 thousand employees1,320 thousand employees1,340 thousand employees1,360 thousand employeesJan 2025Aug 2026Jan 2025: 1,294 thousand employeesJul 2025: 1,335 thousand employeesDec 2025: 1,318 thousand employeesJan 2026: 1,306 thousand employeesAug 2026: 1,358 thousand employees1,358 thousand employees1,294 thousand employees

Source: U.S. Bureau of Labor Statistics, Current Employment Statistics, 2025[1]

Show the data
PeriodValue
Jan 20251,294 thousand employees
Jul 20251,335 thousand employees
Dec 20251,318 thousand employees
Jan 20261,306 thousand employees
Aug 20261,358 thousand employees

Part 1: labor

  • Update each pay grade's wage. For context, average hourly earnings at plumbing, heating and AC contractors rose from $39.30 in January 2025 to $42.65 in August 2026[2].
  • Update benefit costs. Across private industry, benefits are about 30% of total compensation costs[3]; check your own health, retirement and paid-leave costs.
  • Add payroll taxes, workers' compensation and any union or training contributions.
  • Check the share of hours paid at overtime and on-call rates last year.
  • Recalculate billable hours per tech from the field software, not from assumptions.
  • Recompute the loaded cost per billable hour and the labor rate the price book uses.

Part 2: materials

  • Pull current supplier prices for the 100 parts you use most and compare them with the book.
  • Check the markup table: are percentages still right for small parts and for large equipment?
  • Replace discontinued products and update model numbers in task descriptions.
  • Add a consumables allowance where tasks use solder, primer, tape and cleanup supplies.
  • Review truck stock: parts that never move and parts techs run out of.

Part 3: time standards

  • Export actual job times for the 50 most common tasks over the last year.
  • Compare the median actual time with the time each task assumes.
  • Flag tasks where the median is well above or below the standard, and find out why.
  • Update standards for tasks that changed because of new tools, products or code requirements.
  • Add drive, set-up and paperwork time to the minimum charge, not to individual tasks.

Part 4: win rates and option mix

  • Close rate by task and by option tier: which options do customers choose?
  • Tasks with very high close rates: they may be underpriced.
  • Tasks with very low close rates: check the price, the description and how techs present them.
  • Average ticket by tech, and how often each tech presents multiple options.
  • Common objections recorded in job notes or call logs.

A task that nearly everyone buys at the first price shown is not proof of a great price. It may be proof that you are cheaper than you need to be.

Part 5: overhead, vehicles and fees

  • Insurance premiums, licenses, software subscriptions, rent and office wages.
  • Vehicle cost per mile. As a benchmark, the IRS business standard mileage rate for July to December 2026 is 76 cents a mile, up from 70 cents in 2025[4].
  • Card processing and financing dealer fees as a share of revenue.
  • Warranty and callback reserve by job category, recalculated from last year's returns.
  • Service call fee, minimum charge, after-hours charge and trip charge zones.

Part 6: wording, incentives and compliance

  • Rewrite task descriptions in plain words a homeowner understands.
  • Check that code-required items are named and priced, such as expansion tanks and drain pans.
  • Remove expired incentive claims. The federal energy efficient home improvement credit, which covered qualifying water heaters, applies to improvements made through December 31, 2025[5].
  • Check financing wording on proposals against your lender's current approved language.
  • Make sure warranty terms printed on proposals match your current policy.

Example: what one review turned up

Example (fictional): an eight-truck residential shop runs the review in January. The labor update raises its loaded cost per billable hour by about 6%, mostly from wages and health insurance. Supplier files show two water heater lines up modestly and PEX fittings flat.

The time study is more revealing. Toilet replacements now take less time than the standard because the shop switched to a better wax-free seal, so that price can hold steady. Kitchen drain clearing takes longer than assumed because more homes have garbage disposals with grease buildup, so its time standard rises. Leak investigation, priced by the hour, is fine.

Win rates show that the premium water heater option is almost never chosen, while the middle option closes most of the time. The owner rewrites the premium option's description to explain the longer warranty and adds a recirculation option instead. Finally, the office finds an old proposal template still mentioning a federal tax credit for water heaters and removes it.

None of these findings was dramatic on its own. Together they protect several points of margin and remove two sources of customer complaints.

Who owns what

Example assignment of price book review tasks.
Review areaData sourceOwnerDone when
LaborPayroll and benefits reports, field software hoursOwner or controllerNew loaded labor rate approved
MaterialsSupplier price files, truck stock reportsPurchasing or operations managerTop parts updated, markup table confirmed
Time standardsJob time exportsService managerTop 50 tasks checked and updated
Win ratesProposal and close dataService managerOutliers reviewed and actions agreed
Overhead and feesAccounting reportsOwner or bookkeeperOverhead rate and fees approved
Wording and compliancePrice book text, proposal templatesOffice managerDescriptions and templates updated

Common findings and what to do

  1. Labor rate out of date: update it first and reprice every task built on it, rather than adding a flat percentage to everything.
  2. Time standards based on the fastest tech: reset them to the median, and use training to bring slower techs up.
  3. Duplicate or near-duplicate tasks: merge them so techs choose consistently.
  4. Options that never sell: rewrite or replace them; a menu with a dead option looks padded.
  5. Descriptions written for plumbers: rewrite in customer language and say what is included.
  6. Prices that differ between the website and the tablets: fix the source so both read from the same book.

Run it in one week

  1. Before the week

    Export payroll, supplier prices, job times and proposal data, and book the meetings.

  2. Day 1: labor and overhead

    Recalculate the loaded labor rate and overhead percentage. Everything else depends on these.

  3. Day 2: materials

    Update the top parts, markup table and discontinued products.

  4. Day 3: time standards

    Compare actual times with standards for the top tasks and agree changes with the service manager and a senior tech.

  5. Day 4: win rates and wording

    Review close rates and option mix, then rewrite unclear descriptions.

  6. Day 5: approve and schedule

    Approve the new book, set a go-live date and prepare the team briefing and customer notices.

Go live on one date everywhere: tablets, website, phone scripts and proposal templates. Honor open quotes at their original prices, and give members and commercial clients the notice their agreements require; our guide to raising prices without losing loyal customers covers the messaging.

Between annual reviews

Do a quick quarterly check on your highest-volume tasks and any parts with volatile prices, such as copper fittings and water heaters. Also review the reserve for warranty and callbacks, using the method in building warranty costs into prices. Small mid-year corrections keep the annual review from turning into a painful catch-up.

Keep a running list during the year of tasks techs say are mispriced, unclear or missing. Bring that list to the next annual review; the people using the book every day usually spot problems months before the numbers do.

Frequently asked questions

How often should a plumbing price book be reviewed?

A full review once a year, plus a quarterly check of the highest-volume tasks and volatile materials.

What should I update first?

The loaded labor rate and overhead percentage, because most task prices are built from them.

How do I know if a task is underpriced?

Compare actual job times with the standard, check the margin after materials, and look at the close rate. A very high close rate is often a sign.

Should I change prices in the busy season?

It is better to change them in a quieter period, when the team has time to learn the new prices and the website can be updated calmly.

References

  1. U.S. Bureau of Labor Statistics, Current Employment Statistics (2025). All employees, plumbing, heating, and air-conditioning contractors, not seasonally adjusted (CEU2023822001) (opens in a new tab) โ†‘

  2. U.S. Bureau of Labor Statistics, Current Employment Statistics (2026). Average hourly earnings of all employees, plumbing, heating, and air-conditioning contractors, not seasonally adjusted (CEU2023822003) (opens in a new tab) โ†‘

  3. U.S. Bureau of Labor Statistics (2026). Employer Costs for Employee Compensation - June 2026 (opens in a new tab) โ†‘

  4. Internal Revenue Service (2026). Standard mileage rates (opens in a new tab) โ†‘

  5. Internal Revenue Service (2025). Energy Efficient Home Improvement Credit (opens in a new tab) โ†‘

Book a demo

See Ava handle your calls.

Book a short demo. Weโ€™ll walk through your calls and workflow, and agree what Ava should take care of.

Book a demo