Licensing compliance

What changed in the 2024 plumbing codes

Key 2024 UPC changes for plumbers: water heater pans, expansion tanks, shower tests, wet-vented trap arms, and when states adopt them.

AssistCall research teamPublished Reviewed by Faruque Amin, VP of Sales and Marketing6 min read

On this page
  1. Why the 2024 editions matter now
  2. Water heaters: approval, pans and expansion tanks
  3. Showers: body sprays, temperature devices and pan tests
  4. Drainage and venting: longer trap arms on wet vents
  5. Interceptors and other changes
  6. Explaining new requirements to customers
  7. If you work under the IPC
  8. How to get your shop ready
  9. Frequently asked questions
  10. References
Licensing compliance: What changed in the 2024 plumbing codesArticle coverLICENSING COMPLIANCEWhat changed in the2024 plumbing codesAva for PlumbersInsightsLicensing compliance: What changed in the 2024 plumbing codesArticle coverLICENSING COMPLIANCEWhat changed in the2024 plumbing codesAva for Plumbers

Key takeaways

  • The 2024 UPC tightened water heater drain pans: the drain must end where it is readily visible, and relief valves may not discharge into the pan[1].
  • Expansion tanks must now be secured to the structure, not hung on the piping[1].
  • Horizontally wet-vented tubs and showers get longer trap arms: up to 6 feet for 1-1/2 inch and 8 feet for 2 inch drains[1].
  • Adoption is staggered: Oregon's code based on the 2024 UPC took effect October 1, 2026, while California's 2025 code took effect January 1, 2026[1][2].

Why the 2024 editions matter now

Model plumbing codes are revised on a regular cycle, but plumbers only feel a change when their state or city adopts it. That is why the 2024 editions are showing up on job sites in 2026. Oregon's 2026 Oregon Plumbing Specialty Code, based on the 2024 Uniform Plumbing Code with Oregon amendments, became effective October 1, 2026[1]. California's 2025 Building Standards Code, which adapts national model codes into state law, took effect January 1, 2026[2]. Florida must adopt an updated building code every three years based on the ICC's International Codes[3], so IPC changes reach Florida contractors on that schedule.

This guide focuses on changes to the 2024 Uniform Plumbing Code that Oregon's Building Codes Division marks as new 2024 UPC language or significant changes in its official adoption summary[1]. If you work under the IPC, look for your own state's change summary; most states publish one when they adopt a new edition, and the topics below are a good checklist of what to look for.

Water heaters: approval, pans and expansion tanks

Water heaters are where most service plumbers will notice the 2024 UPC first. Three changes stand out in Oregon's summary[1]:

  • Final approval: section 501.1 now says water heater installations must be approved by the building official, aligning with permit and inspection requirements.
  • Drain pans: section 507.4 was rewritten as a numbered list. The terminating end of the pan drain must now be readily visible, so leaks are noticed before they cause major damage. Pan drain piping must be rated for the water heater's temperature rating, and discharge from a relief valve into a drainage pan is prohibited. The existing exceptions for replacing an existing water heater and for instantaneous water heaters remain.
  • Expansion tanks: sections 608.2 and 608.3 now require expansion tanks to be securely fastened to the structure. Relying on the piping to support the tank is not acceptable unless the local building official approves it as an alternate method.

The drain pan change has a clear purpose. Water damage and freezing caused 22.6% of homeowners insurance losses in 2023[4], and the average claim was $15,400 over 2019 to 2023[5]. A pan drain that ends somewhere visible, such as a floor drain, laundry sink or the building exterior, turns a hidden slow leak into one the homeowner notices.

Update your water heater install checklist: visible pan drain termination, temperature-rated pan piping, relief valve discharge kept out of the pan, and an expansion tank strapped or bracketed to the structure.

Showers: body sprays, temperature devices and pan tests

Three shower changes affect remodelers and anyone installing custom shower systems[1]:

  • Body sprays: the UPC added a definition of body spray, a shower device that sprays water onto a bather from other than the overhead position, and a flow rate limit in section 408.3 where the code previously had no guidance. Oregon amended the limit to 1.8 gallons per minute at 80 psi to match its existing rules, so check your local amendment for the number that applies.
  • Temperature-actuated, flow-reduction devices: new section 408.4.3 says these devices, where installed on individual fixture fittings, must comply with ASSE 1062, and they may not be used alone as a substitute for required balanced pressure, thermostatic or combination shower valves, or for bathtub temperature-limiting valves.
  • Shower receptor tests: site-built watertight shower receptors must be tested with water at a depth of not less than 2 inches for not less than 15 minutes. Where there is no dam or curb, a temporary 2 inch barrier must be built for the test.

The receptor test change matters for curbless showers, which are increasingly popular. Plan the temporary barrier into the job so the test does not hold up tile work.

Drainage and venting: longer trap arms on wet vents

The UPC added a note to Table 1002.2 that allows longer trap arms for some fixtures on a horizontal wet vent. Horizontally wet-vented bathtubs, showers and similar fixtures may now have trap arms of up to 6 feet for 1-1/2 inch fixture drains and 8 feet for 2 inch fixture drains, at a slope of 1/4 inch per foot[1]. The standard table still limits a 1-1/2 inch trap arm to 42 inches and a 2 inch trap arm to 60 inches[1]. The longer lengths apply only to fixtures served by a horizontal wet vent.

Maximum trap arm length in the 2024 UPCWet-vented lengths of 6 and 8 feet shown in inches
Maximum trap arm length in the 2024 UPCColumn chart. 1-1/2 inch drain: Standard table 42 inches, Horizontally wet-vented tub or shower 72 inches; 2 inch drain: Standard table 60 inches, Horizontally wet-vented tub or shower 96 inches.0 inches25 inches50 inches75 inches100 inches1-1/2 inch drain · Standard table: 42 inches42 inches1-1/2 inch drain · Horizontally wet-vented tub or shower: 72 inches72 inches1-1/2 inch drain2 inch drain · Standard table: 60 inches60 inches2 inch drain · Horizontally wet-vented tub or shower: 96 inches96 inches2 inch drainMaximum trap arm length in the 2024 UPCColumn chart. 1-1/2 inch drain: Standard table 42 inches, Horizontally wet-vented tub or shower 72 inches; 2 inch drain: Standard table 60 inches, Horizontally wet-vented tub or shower 96 inches.0 inches25 inches50 inches75 inches100 inches1-1/2 inch drain · Standard table: 42 inches42 inches1-1/2 inch drain · Horizontally wet-vented tub or shower: 72 inches72 inches1-1/2 inchdrain2 inch drain · Standard table: 60 inches60 inches2 inch drain · Horizontally wet-vented tub or shower: 96 inches96 inches2 inch drain
  • Standard table
  • Horizontally wet-vented tub or shower

Source: Oregon Building Codes Division, 2026[1]

Show the data
ItemStandard tableHorizontally wet-vented tub or shower
1-1/2 inch drain42 inches72 inches
2 inch drain60 inches96 inches

This gives designers more freedom in bathroom layouts, especially when relocating a tub or shower in a remodel. Make sure your crews know the limit applies only to wet-vented bathing fixtures, not to lavatories or kitchen sinks.

Interceptors and other changes

Other 2024 UPC changes shown in Oregon's adoption summary[1]
SectionChangeWho should care
Table 1009.1New table listing approved interceptor types and the standards each must meetCommercial and restaurant plumbers
1017.3Oil and flammable liquid interceptor details reorganized into a numbered listCommercial and garage work
Wall-hung water closetsCarrier fittings must be securely attached to the structureCommercial restroom installers
312.9 nail platesProtection now covers plastic and copper tubing as well as piping in framingNew construction and remodel crews
Dual purpose water heatersNew definition and installation reference for units serving both space and water heatingInstallers of combination systems

Oregon's summary notes that it does not include every change adopted[1]. Treat it as a checklist, then read the code sections that affect your type of work.

Explaining new requirements to customers

Code changes often add a little cost to a job, and customers notice. A water heater replacement that now needs an expansion tank bracket, a relocated pan drain or new pan piping may come in higher than the last one the customer bought. Give CSRs and technicians a short explanation: the code changed in this jurisdiction, the change protects the home from hidden leaks or damage, and the inspection requires it.

Put the new items in your price book as named line items rather than burying them, so the estimate explains itself. For shower remodels, explain that the new receptor test protects the customer's floors and ceilings below, and that building a temporary barrier for a curbless shower is part of doing the job right. Customers rarely object to a requirement they understand.

If you work under the IPC

The 2024 International Plumbing Code was revised on its own cycle, and its changes are different from the UPC's. If your jurisdiction uses the IPC or the International Residential Code, find out when it plans to adopt the 2024 editions, then get the state or city change summary when it is published. Use the topics in this article as a checklist of where to look: water heater installation and pans, expansion tanks, shower controls and testing, venting and trap arms, and interceptors.

How to get your shop ready

  1. Confirm the adoption date

    Find the effective date in each jurisdiction you serve and whether permits applied for before it follow the old edition.

  2. Get the change summary

    Download your state's summary of amendments and significant changes for the new edition.

  3. Update checklists and price book

    Add new requirements, such as structural support for expansion tanks and visible pan drains, to install checklists and estimates.

  4. Train the crews

    Hold a toolbox talk on the changes that affect your common jobs, with photos of compliant installs.

  5. Talk to inspectors

    Ask local inspectors which changes they are focusing on in the first months.

  6. Track corrections

    Log any inspection corrections tied to new rules and share the fixes with everyone.

Example: a fictional Portland-area shop, Cascade Service Plumbing, reviews Oregon's change summary in September 2026. It adds wall brackets for expansion tanks to every water heater kit, prices the extra labor into its flat-rate book, and updates its install checklist to require a photo of the visible pan drain termination. In the first month under the new code, its water heater inspections pass without corrections. Read next: IPC vs UPC and backflow testing certification.

Frequently asked questions

What changed for water heaters in the 2024 UPC?

Final installation approval by the building official, a rewritten drain pan section requiring a visible drain termination, temperature-rated pan piping and no relief valve discharge into the pan, and expansion tanks secured to the structure.

When does the 2024 UPC take effect?

It depends on the state or city. Oregon's code based on the 2024 UPC took effect October 1, 2026. Check your local building department for its adoption date.

Are body sprays limited now?

Yes. The 2024 UPC added a body spray definition and a flow rate limit. Oregon set its limit at 1.8 gallons per minute at 80 psi, so check local amendments.

Do the longer trap arm lengths apply to every fixture?

No. The 6 and 8 foot lengths apply only to bathtubs, showers and similar fixtures on a horizontal wet vent.

References

  1. Oregon Building Codes Division (2026). 2026 Oregon Plumbing Specialty Code: Summary of amendments and significant changes (opens in a new tab) ↑

  2. California Building Standards Commission (2026). Codes: California Building Standards Code (opens in a new tab) ↑

  3. The Florida Legislature (2026). Florida Statutes, Section 553.73: Florida Building Code (opens in a new tab) ↑

  4. Insurance Information Institute (2023). Facts + Statistics: Homeowners and renters insurance (opens in a new tab) ↑

  5. Insurance Information Institute (2019-2023). Facts + Statistics: Homeowners and renters insurance (opens in a new tab) ↑

Book a demo

See Ava handle your calls.

Book a short demo. We’ll walk through your calls and workflow, and agree what Ava should take care of.

Book a demo