Licensing compliance

Filing backflow test reports correctly

Who receives a backflow test report, what it must show, how fast it is due, why reports get sent back and how the office keeps each assembly on schedule.

AssistCall research teamPublished Reviewed by Faruque Amin, VP of Sales and Marketing9 min read

On this page
  1. A passed test is not a filed test
  2. Who gets a copy, and why
  3. When a test, and a report, is due
  4. Build a cheat sheet for each supplier
  5. What a complete report shows
  6. Why reports get sent back
  7. A same-day filing routine
  8. Failed tests and repairs
  9. Keeping customers on schedule
  10. Keep your copies
  11. Frequently asked questions
  12. References
Licensing compliance: Filing backflow test reports correctly10: working days Oregon gives a backflow tester to get each test report to the water supplierLICENSING COMPLIANCEFiling backflow test reportscorrectly10working days Oregon gives a backflow tester to get each testreport to the water supplierAva for PlumbersInsightsLicensing compliance: Filing backflow test reports correctly10: working days Oregon gives a backflow tester to get each test report to the water supplierLICENSING COMPLIANCEFiling backflow testreports correctly10working days Oregon gives a backflowtester to get each test report to thewater supplierAva for Plumbers
Figure source: Oregon Health Authority (Oregon Administrative Rules, via Public.Law), 2026[1]

Key takeaways

  • The water supplier is the customer for the report: it sets or approves the form and, in many places, the deadline[2][3].
  • Oregon wants three copies within 10 working days, for the tester, the property owner and the water supplier[1].
  • Texas wants a signed, dated original for each assembly on Form 20700 or an approved form, including the test gauge serial number[2].
  • Due dates belong to each assembly: Florida tests residential assemblies at least every two years and non-residential ones at least yearly[4].
  • Most rejections are clerical, and a same-day office check catches them before the report is filed.

A passed test is not a filed test

Testers finish the field work quickly; the report is what decides whether the customer gets a thank-you or a non-compliance letter from the water supplier. Until the supplier holds a complete report in the form it accepts, the assembly is overdue on its books, whatever the gauge read on the day. For an office manager, backflow work is a paperwork job with a field visit attached.

The rules differ by state and often by water system. There are over 148,000 public water systems in the US[5], approximately 48,000 of them community water systems[6], and in a state like Washington each purveyor sets the report contents and the time allowed to submit it[3]. Oregon writes its deadline into state rule[1]. Texas fixes the form[2]. An office that files for several suppliers needs a one-page cheat sheet per supplier, and someone who keeps it current.

Who gets a copy, and why

Ask each supplier how it wants reports delivered: portal, email or paper. Note the answer on its cheat sheet.
RecipientWhy they need itWhat to send
Water supplier (purveyor)It keeps the compliance record for every assembly that protects its system.The original, or whatever format it specifies. In Texas: the signed and dated original on Form 20700 or an approved form[2].
Property owner or water userProof the test was done, and a record for the next tester.A full copy. Oregon requires one[1].
Your company fileDisputes, re-filing and the customer history.A full copy with photos. Oregon makes it part of the tester's permanent records[1].
Property manager or site contactThey arrange access and often approve the invoice.A copy if the owner agrees, plus the next due date.

Oregon's rule is the clearest statement of the principle. The tester produces three copies of every report, one for the tester's permanent records, one for the water user or property owner and one for the water supplier, provided within 10 working days and in a manner and form the supplier accepts[1]. Even where no rule says so, those three copies are the right habit.

When a test, and a report, is due

Washington and Oregon require a test when an assembly is installed, repaired or relocated, after a backflow incident and at least once a year[1][3]. Washington adds reinstallation and lets the purveyor require more frequent tests for high-hazard premises or assemblies that keep failing[3]; Oregon allows more frequent tests for the same reasons[1]. Texas requires a test on installation and at least annually for assemblies protecting against health hazards[2].

Annual is not universal, though. Florida splits by connection: assemblies at non-residential connections are tested at least annually, assemblies at residential connections at least every two years, and air gaps are inspected at least annually[4]. A supplier can also ask for more than the state minimum. That is why the due date has to live on each assembly record, not on the customer account. A school with six assemblies can have six different due dates if they were installed or repaired at different times.

Florida's minimum test and inspection intervalsLongest interval allowed between tests or inspections under Florida Rule 62-555.360. Suppliers may require more often.
Florida's minimum test and inspection intervalsComparison. Assembly, non-residential connection: 12 months; Assembly, residential connection: 24 months; Air gap inspection: 12 months.12 monthsAssembly, non-residentialconnectionAssembly, non-residential connection: 12 months24 monthsAssembly, residentialconnectionAssembly, residential connection: 24 months12 monthsAir gap inspectionAir gap inspection: 12 monthsFlorida's minimum test and inspection intervalsComparison. Assembly, non-residential connection: 12 months; Assembly, residential connection: 24 months; Air gap inspection: 12 months.12 monthsAssembly, non-residential connectionAssembly, non-residential connection: 12 months24 monthsAssembly, residential connectionAssembly, residential connection: 24 months12 monthsAir gap inspectionAir gap inspection: 12 months

Source: Legal Information Institute, Cornell Law School, 2026[4]

Show the data
ItemMonths
Assembly, non-residential connection12 months
Assembly, residential connection24 months
Air gap inspection12 months

Build a cheat sheet for each supplier

Every water supplier you file with gets one page. Keep the pages in one shared folder, put a review date at the top of each, and update a page the day a report comes back with a reason you had not seen before. Without the sheet, filing knowledge lives in one person's head and leaves with them.

  • Supplier name and the ZIP codes or towns it serves, since neighboring addresses can belong to different suppliers.
  • How reports are submitted: portal address and who holds the login, email address, or mailing address.
  • The form it requires, with the version date, and whether it accepts your own template.
  • The deadline after a test, and whether it counts calendar days or working days.
  • What it wants for a failed test: the failed report at once, or one report covering failure, repair and retest.
  • Whether the customer copy must go out from you, and any filing fee the supplier charges.
  • A contact name or line for rejected reports.

What a complete report shows

Supplier forms vary, but they ask for the same core facts. Washington's list of the records a purveyor keeps for every assembly makes a good checklist: exact location, type, manufacturer, model, size and serial number, the hazard it protects against, installation date, the history of tests and repairs, the results and who performed the test[3]. Build your own form or tablet template around that list and the supplier forms become easy to fill in.

  • Account and site: the supplier's account or premises number, the service address and the exact assembly location, such as “mechanical room, north wall, 6 ft up”.
  • Assembly: type, manufacturer, model, size and serial number, matching the supplier's record.
  • Readings: each check valve and relief valve reading, with pass or fail for each.
  • Repairs: parts replaced, and the retest readings after the repair.
  • Tester: name, certification number and expiration date, signature and date.
  • Test gauge: serial number and the date it was last checked for accuracy. Texas requires the gauge serial number on Form 20700 and an annual accuracy test of the gauge[2].
  • Outcome: passed, failed and repaired, or failed and not repaired, with what the customer was told.

Why reports get sent back

Rejections are rarely about the test. They are about the paper. These are the usual reasons, and every one of them can be caught in the office before the report goes out:

  • Serial number does not match the supplier's record. A replaced assembly needs the new serial number and, usually, a note of the replacement.
  • Wrong or outdated form. Texas requires approval for any variation from Form 20700[2]; other suppliers revise their forms with little warning.
  • Missing test gauge serial number or calibration date.
  • Unsigned or undated.
  • Tester certification expired on the test date. Track certifications next to due dates, check them the way you would a plumbing license lookup, and see backflow tester certification for renewals.
  • A failed test with no retest. A repair report without post-repair readings is incomplete.
  • Late. Oregon allows 10 working days[1]; other suppliers set their own window[3].
  • A location too vague for the next tester to find the assembly.

A same-day filing routine

  1. Pre-fill before the visit

    Load the supplier's form with the account, location and assembly details from your records, so the tech confirms them rather than copying them on site.

  2. Complete and photograph on site

    Readings, signature, a photo of the assembly tag showing the serial number and a photo of the gauge's calibration label.

  3. Check it in the office the same day

    Compare the serial number, location and account number with the supplier's record and look at every field. Two minutes here saves a rejection letter.

  4. File through the supplier's channel

    Portal, email or mail, as each supplier specifies; Washington leaves the method to the purveyor[3].

  5. Save the receipt

    Keep the portal confirmation or the sent email with the report.

  6. Send the customer copy and next due date

    One message: report attached, the result and the next test date.

Example: one backflow report from test to filed
  • Your team
  • System
  1. 01Your team

    Test on site

    Readings taken, tag and gauge label photographed, report signed and dated.

  2. 02Your team

    Office check

    Serial, location and account number matched to the supplier's record.

  3. 03System

    Filed with the supplier

    Through the portal, email or mail address that supplier specifies.

  4. 04Your team

    Receipt saved

    Confirmation stored with the report in the customer record.

  5. 05Your team

    Customer copy sent

    Report, result and next due date in one message.

  6. 06System

    Next due date set

    Reminder scheduled from the assembly's own test interval.

Example routine for an office filing reports with several water suppliers.

Failed tests and repairs

A failed test starts a second clock. The assembly has to be repaired and tested again: Oregon, Washington and Florida all require a test after a repair[1][3][4]. Tell the customer the result before the tech leaves, quote the repair in writing and find out what your supplier wants for a failure: some want the failed report straight away, others want one report showing the failure, the repair and the passing retest. Ask once and put the answer on that supplier's cheat sheet.

Set a follow-up date on every failed assembly the same day. A quote with no follow-up leaves the customer out of compliance and leaves you holding a report you cannot close. On commercial accounts, copy the property manager as well as the owner; the person who approves repairs is often not the person who signed the service agreement.

Keeping customers on schedule

Many water suppliers send their own notices when a test comes due, and those notices make the phone ring. The calls are routine but easy to fumble: the caller has a letter, an account number and a deadline, and wants a date. Capture all three and book against the deadline on the letter, not the next open slot, leaving room to repair and retest inside it if the assembly fails.

Example: a property manager calls on the 28th with a supplier notice for a 2-inch assembly at a strip mall, due on the 15th of next month. The CSR takes the account number and due date from the notice, the location (“rear service room, key from unit 4”) and the manager's mobile number. The test goes on the route for the following week, which leaves about two weeks to repair, retest and file inside the deadline if the assembly fails.

If an SI Employee answers your overflow or after-hours calls, give it the questions for these calls: service address, the account number and due date on the notice, where the assembly is and who can give access. It books the test into your tested schedule or takes a request for the office to confirm, and the summary arrives by email (more on AssistCall). Accounts with many assemblies and several site contacts look like the commercial contractor example, and building the yearly route around due dates is covered in building a recurring backflow testing route.

Keep your copies

Keep every report you file, with the photos and the supplier's receipt. Oregon makes the tester's copy part of the tester's permanent records[1]. Washington purveyors keep assembly inventory records for five years or the life of the assembly, whichever is shorter[3], so a supplier may ask about a test from years ago. Your wider retention schedule is in what records a plumbing business must keep.

Spring is when irrigation assemblies come back into service and test requests stack up; hose bibs, irrigation and backflow in spring covers that season. If your service area also has a lead pipe replacement program, the same addresses may be getting utility letters about their service lines, so it helps to know how to read lead service line maps too.

Frequently asked questions

Who files the backflow test report, the tester or the property owner?

Usually the tester or the tester's company. Texas requires the tester's signed and dated original to go to the public water supplier[2], and Oregon requires the tester to provide copies to both the supplier and the owner[1].

Can we use our own report form?

Only if the supplier accepts it. In Texas any form that differs from Form 20700 needs approval before use[2]; in Oregon and Washington the report must be in a form acceptable to the water supplier[1][3].

How fast does the report have to reach the supplier?

It depends on where you work. Oregon sets 10 working days[1]; Washington leaves the time frame to each purveyor[3]. Filing the same day removes the question.

Do residential assemblies need testing every year?

Not everywhere. Florida's rule sets at least every two years for residential connections and at least annually for non-residential ones[4], and a supplier can require more.

How long should we keep copies of test reports?

At least as long as your suppliers keep theirs. In Washington that is five years or the life of the assembly, whichever is shorter[3]; Oregon testers keep theirs as permanent records[1].

References

  1. Oregon Health Authority (Oregon Administrative Rules, via Public.Law) (2026). OAR 333-061-0070: Cross Connection Control Requirements (opens in a new tab) ↑

  2. Legal Information Institute, Cornell Law School (2026). 30 Tex. Admin. Code 290.44: Water Distribution (opens in a new tab) ↑

  3. Washington State Legislature (2026). WAC 246-290-490: Cross-connection control (opens in a new tab) ↑

  4. Legal Information Institute, Cornell Law School (2026). Fla. Admin. Code r. 62-555.360: Cross-Connection Control for Public Water Systems (opens in a new tab) ↑

  5. U.S. Environmental Protection Agency (2026). Information about Public Water Systems (opens in a new tab) ↑

  6. U.S. Environmental Protection Agency (2025). Fact Sheet: 2025 Update to the 7th Drinking Water Infrastructure Needs Survey and Assessment (opens in a new tab) ↑

Book a demo

See Ava handle your calls.

Book a short demo. We’ll walk through your calls and workflow, and agree what Ava should take care of.

Book a demo