Key takeaways
- Gross margin is revenue minus the direct costs of doing the work, divided by revenue; the hard part is deciding consistently what counts as direct.
- Put field labor at its loaded cost, including payroll taxes and benefits, plus materials, permits, subcontractors and job-specific disposal in cost of goods sold.
- Payroll alone equalled about 27% of receipts at plumbing, heating and AC contractors in 2022, before materials[1].
- Material prices move fast: the producer price index for copper and brass mill shapes rose about 30% from September 2025 to September 2026[2].
Gross margin in one line
Gross margin is gross profit divided by revenue, where gross profit is revenue minus the cost of goods sold. In a plumbing company, cost of goods sold means the costs that exist only because a job was done: the technician's time on that job, the parts installed, the permit pulled and the subcontractor hired for it. Everything else, from the office lease to the marketing budget, sits below the gross profit line as overhead.
Gross margin is the first test of whether your prices work. If it is too thin, overhead and profit have nothing to come out of, however busy the trucks are. It is also the number lenders, buyers and bookkeepers look at first, so it pays to calculate it the same way every month.
Margin is not the same as markup. Markup is calculated on cost and margin on price, so a part bought for a given amount and marked up by half produces a margin of one third, not one half. Mixing the two in a price book is one of the most common reasons owners think they are earning more than they are.
What goes in cost of goods sold
| Cost | In COGS? | Why |
|---|---|---|
| Technician wages for time on jobs | Yes | Direct labor, varies with work done |
| Payroll taxes, workers comp and benefits on that labor | Yes | Part of the true cost of a field hour |
| Materials and parts installed | Yes | Consumed by the job |
| Permits and inspection fees | Yes | Exist only because of the job |
| Subcontractors such as excavation or concrete | Yes | Bought for a specific job |
| Equipment rental for a job | Yes | Job-specific |
| Disposal fees for removed equipment | Yes | Job-specific |
| Sales commissions and spiffs | Usually yes | Tied directly to sold work |
| Office staff, dispatch, customer service | No | Overhead that supports all jobs |
| Marketing and lead costs | No | Overhead, tracked as acquisition cost |
| Rent, software, insurance, owner salary | No | Overhead |
The gray areas, and a rule for each
- Vehicles. Fuel and maintenance for field trucks can go either way. Many service shops keep them in overhead and recover them through the hourly rate; what matters is choosing once and staying consistent.
- Non-billable technician time. Training days, shop time and waiting for parts are real costs. Put them in COGS as unapplied labor, or your margin looks better than the business is.
- Warranty callbacks. Labor and parts on a no-charge return visit belong in COGS for the original job type. Hiding them in overhead makes your worst jobs look profitable.
- Card processing fees. Most shops treat them as overhead, but if a large share of revenue is paid by card, track them as a percentage so price changes account for them.
- Shop supplies and small consumables. Rags, solder and thread sealant are usually charged through a flat percentage or a materials line; either way, record them the same way every month.
- Apprentices. Wages for an apprentice on a job are direct labor even if they do not bill separately.
Write your COGS rules on one page and give a copy to your bookkeeper. A gross margin that changes because the accounts were coded differently is worse than no number at all.
Calculating it step by step
Total revenue for the period
Use invoiced revenue, net of sales tax and refunds, for one month or one quarter.
Add direct labor at loaded cost
Take field wages from payroll, including unapplied hours, then add employer payroll taxes, workers compensation and the employer share of benefits.
Add materials
Use the cost of parts actually installed. If you buy stock in bulk, adjust for the change in truck and warehouse inventory or your margin will jump around with purchasing.
Add other job costs
Permits, subcontractors, equipment rental, disposal and commissions tied to sold work.
Subtract and divide
Gross profit equals revenue minus the total of steps two to four. Gross margin equals gross profit divided by revenue.
Repeat by department
Run the same calculation for service, drain, replacement and new construction. A healthy company total can hide one department that loses money.
Example: one month at a small shop
Example: a fictional four-technician residential shop records the following for October. All figures are illustrative.
| Line | Amount | Share of revenue |
|---|---|---|
| Revenue | $182,000 | 100% |
| Field wages, including unapplied hours | $41,600 | 22.9% |
| Payroll taxes, workers comp, benefits | $13,700 | 7.5% |
| Materials installed | $36,400 | 20.0% |
| Permits, subcontractors, disposal | $6,300 | 3.5% |
| Commissions on sold work | $5,500 | 3.0% |
| Gross profit | $78,500 | 43.1% |
Example, continued: if the same shop had left benefits and unapplied hours out of COGS, gross margin would have shown above half of revenue, and the owner would have priced next year's work against a number that never existed.
Industry context for the labor line
Census figures show how heavy labor is in this industry. In 2022, plumbing, heating and AC contractors reported receipts of about $306.3 billion and annual payroll of $82.2 billion, so payroll equalled roughly 27% of receipts[1]. That payroll covers office and management staff as well as field crews, so it is not a direct COGS benchmark, but it shows why labor accounting deserves the most care.
- Payroll 26.9%
Source: U.S. Census Bureau, 2022[1]
Show the data
| Item | Value |
|---|---|
| Payroll | 26.9% |
Wages are only part of the cost. Across private industry in June 2026, employers paid an average $46.89 per hour worked in total compensation, of which benefits were $14.07, or 30.0%[3]. At plumbing, heating and AC contractors, average hourly earnings rose about 4.4% in the year to September 2026, preliminary[4]. If your prices were set before that rise and your COGS only counts base wages, the margin you report is overstated twice.
Material costs move faster than price books
The producer price index for plumbing fixtures and fittings rose about 5.8% between September 2025 and September 2026 and about 34% since September 2019[5]. The index for copper and brass mill shapes, which tracks the metal behind pipe and fittings, rose about 30% in the year to September 2026[2]. A price book updated once a year cannot keep up with moves like that, and the materials share of revenue creeps up month by month.
Check the materials line as a share of revenue every month. If it rises two months running with no change in job mix, update material prices or markups before the quarter closes. The article on job costing shows how to catch it at the level of individual jobs.
Reading the trend each month
A single month's gross margin says little. The trend over six to twelve months, broken down by its three main parts, says a lot. Put labor, materials and other job costs on separate lines, each as a share of revenue, and look at which one moved.
- Labor share rising: check billable hours, overtime and callbacks before blaming wages. Lost hours usually cost more than raises.
- Materials share rising: check supplier invoices against the price book, then look for jobs where materials were installed but not billed.
- Other job costs rising: look for subcontracted excavation, equipment rental or disposal that was not quoted into the job.
- All three flat but margin falling: revenue is the problem, usually discounting or a shift toward lower-margin work.
Ask your bookkeeper three questions each month: were any job costs posted to overhead accounts, was inventory counted or estimated, and were any large credits or refunds issued? The answers explain most surprises before you start changing prices.
Ways to raise gross margin
- Recalculate the labor rate from loaded cost and real billable hours each year.
- Cut unapplied time through better routing, parts staging and accurate job durations.
- Track callbacks by job type and fix the causes; free return visits are pure margin loss.
- Review material markups when supplier prices change, not on a fixed calendar.
- Compare margin by department and decide whether a low-margin line of work earns its place.
Departments deserve their own view. Drain work often runs a high margin on low material use, replacements carry more equipment cost, and new construction usually runs the thinnest margin of all because bids are competitive and schedules slip. None of that is wrong in itself, but each department should cover its share of overhead. If one does not, either reprice it, change how it is staffed, or decide deliberately that it stays for strategic reasons, such as feeding service work later.
Gross margin then feeds revenue per technician and net profit: if gross profit does not cover overhead with room to spare, no amount of extra volume will fix the bottom line.
Frequently asked questions
What is a good gross margin for a plumbing company?
It depends on job mix. Residential service work usually carries a higher margin than new construction or large installs. Track your own margin by department and compare each with its own history rather than with one industry figure.
Is the technician's truck part of cost of goods sold?
It can be, but many service shops treat vehicles as overhead and recover them through the hourly rate. Either approach works if you apply it every month the same way.
Why does my gross margin swing so much month to month?
The usual causes are buying materials in bulk without adjusting for inventory, a few large replacement jobs, and coding differences in the books. Fix the inventory adjustment first.
References
U.S. Census Bureau (2022). Statistics of U.S. Businesses 2022: U.S. and states, 6-digit NAICS (opens in a new tab) โ
U.S. Bureau of Labor Statistics, via Federal Reserve Bank of St. Louis (FRED) (2026). Producer Price Index by Commodity: Metals and Metal Products: Copper and Brass Mill Shapes (WPU102502) (opens in a new tab) โ
U.S. Bureau of Labor Statistics (2026). Employer Costs for Employee Compensation - June 2026 (opens in a new tab) โ
U.S. Bureau of Labor Statistics, Current Employment Statistics (2026). Average hourly earnings of all employees, plumbing, heating, and air-conditioning contractors, not seasonally adjusted (CEU2023822003) (opens in a new tab) โ
U.S. Bureau of Labor Statistics, via Federal Reserve Bank of St. Louis (FRED) (2026). Producer Price Index by Commodity: Metals and Metal Products: Plumbing Fixtures and Fittings (WPU105) (opens in a new tab) โ