Key takeaways
- Most service and same-day repair work needs no deposit; deposits fit special orders, scheduled replacements and larger projects.
- Some states cap home improvement deposits: California at $1,000 or 10% of the price, whichever is less, and Maryland at one-third.
- Sales a tech makes at the home beyond the repair the customer asked for can fall under the federal three-day cooling-off rule.
- A written policy with clear refund terms makes customers more willing to pay a deposit, not less.
What a deposit is for
A deposit does two jobs. It commits the customer, so a scheduled crew day is not lost to a last-minute cancellation, and it covers money you spend before the work starts, such as a special-order fixture or a tankless unit that cannot be returned. It is not a way to fund your business with customers' money, and in several states the law makes that clear.
Customers have their own worry: paying up front to a company that might not show up. That worry has a basis. Of construction establishments that opened in March 2015, 83.3% were still operating a year later, 57.5% after five years and 42.5% after ten[1]. A homeowner who has heard of a contractor disappearing with a deposit will judge your request by how clearly you explain it.
Source: U.S. Bureau of Labor Statistics, 2015-2025[1]
Show the data
| Item | Value |
|---|---|
| After 1 year | 83.3% |
| After 5 years | 57.5% |
| After 10 years | 42.5% |
State limits: two examples
Deposit rules for home improvement work are set by states, and they vary. Two well-known examples show how specific they can be.
- California: for a home improvement job, a down payment before work starts cannot be more than $1,000 or 10% of the contract price, whichever is less, and there are no exceptions for special-order materials[2]. Payments under the schedule cannot exceed the value of the work performed, and projects over $500 in combined labor and materials must be in a written contract[2].
- Maryland: a home improvement contractor cannot accept more than one-third of the contract price as a deposit, and may not accept any payment until the contract is signed[3]. Beyond the initial deposit, the payment schedule is left to the homeowner and contractor to negotiate[3].
Other states have their own limits, contract requirements or none at all, and some local licensing boards add rules. Check your state contractor board and home improvement law before setting a policy, and recheck when you expand into a new state. This is general information, not legal advice.
Example (fictional): a California customer signs an $8,400 contract to replace a water heater with a special-order unit and repipe the garage section. Ten percent of the price is $840, which is less than $1,000, so the most the contractor can take before work starts is $840, even though the unit alone costs more.
Which jobs need a deposit
| Job type | Typical approach | Why |
|---|---|---|
| Service call or drain cleaning | No deposit; pay on completion | Short job, no special materials, same-day work |
| Same-day water heater replacement from stock | No deposit; pay on completion | Unit comes off the truck or the supply house shelf |
| Scheduled replacement with special-order unit | Deposit within the state limit | Non-returnable equipment ordered for this customer |
| Fixture upgrades with customer-chosen fixtures | Deposit within the state limit, or customer buys fixtures | Ordering risk and restocking fees |
| Sewer line or repipe project | Deposit, then progress payments tied to milestones | Multi-day crew commitment and permit costs |
| Commercial or new construction | Contract terms: schedule of values, progress billing | Governed by the contract, not by home improvement deposit rules |
The pattern is simple. The more money you commit before the work starts, the stronger the case for a deposit. Where state law limits the deposit below what you spend up front, use progress payments tied to clear milestones, or ask the supplier for a deposit-backed order directly with the customer.
The cooling-off rule and sales made at the home
The FTC's Cooling-Off Rule gives buyers until midnight of the third business day after certain sales made at their home to cancel for a full refund, and sellers must refund within 10 days of a cancellation[4]. It does not cover sales under $25 at the home, sales needed to meet an emergency, or repair and maintenance the buyer asked the seller to come and perform[4].
That last point matters for plumbers. The repair the customer called you for is usually excluded. But anything your tech sells beyond that request, such as a replacement unit, a whole-house filter or a membership, can be covered[4]. If you take a deposit on that kind of sale at the kitchen table, give the required cancellation notice and be ready to refund it. Many states have their own home-solicitation cancellation rules too.
Design a fair deposit policy
Set the trigger
Decide which jobs require a deposit: special-order equipment, scheduled projects above a set value, or any job that blocks a full crew day.
Set the amount within the law
Use a percentage of the contract price, capped at your state's limit. In California, that means the lesser of $1,000 or 10% for home improvement work[2].
Tie it to something real
Name what the deposit covers on the contract: ordering the unit, scheduling the crew, pulling the permit.
Write the refund terms
State when the deposit is refundable in full, when you keep restocking or permit costs, and how fast you refund. Keep it short.
Take it the right way
Only after the contract is signed, by a traceable method, with a receipt that names the job and the contract.
Apply it visibly
Show the deposit as a credit on the final invoice so the customer sees it counted.
What to say when asking for a deposit
Most customers accept a deposit that is explained before they are asked to pay it. Script the request and the answers to the usual questions.
- Because this unit is a special order for your home and cannot be returned, we take a deposit when you sign. It goes toward the unit and is credited on your final invoice.
- The deposit is within what state law allows for home improvement work, and the rest is due when the job is complete.
- If you cancel before we order the unit, the deposit is refunded in full. After we order it, we refund everything except the supplier's restocking fee, which is shown on the contract.
- You can pay the deposit by card or check, and you will get a receipt with the job and contract number on it.
Avoid asking for a deposit on the phone before anyone has seen the job, and never describe it as a booking fee for a service call. That is when customers start to suspect the money will not come back.
Deposits, progress payments and financing
A deposit is only one of three tools for managing up-front costs. Progress payments, tied to milestones such as rough-in inspection or main line installed, suit multi-day jobs and are often the cleaner option where state law caps deposits. Third-party financing moves the payment question to a lender, who usually funds you after completion; see our guide to offering customer financing.
Smaller shops feel deposit rules most. About 58% of plumbing, heating and AC contractor establishments had fewer than five employees in 2023[5], and those firms often carry special-order costs on a credit card until the job is paid. Supplier accounts with longer terms, or ordering only after the deposit clears, can protect cash flow without asking customers for more than the law allows.
Common deposit mistakes
- Using one deposit percentage in every state you serve, without checking each state's limit.
- Taking the deposit before the contract is signed, or with no written contract at all.
- Calling a non-refundable fee a deposit, then refusing refunds when the customer cancels before anything was ordered.
- Spending deposits on unrelated bills, then struggling to order the materials they were meant to cover.
- Forgetting to credit the deposit on the final invoice, which looks like double billing to the customer.
- Collecting a deposit at the kitchen table on an upsell without giving a cooling-off cancellation notice.
Each of these turns a reasonable practice into a complaint. Most can be prevented with one contract template, one receipt format and a monthly check that every open deposit is matched to a job that is ordered or scheduled.
Records to keep
- The signed contract with the deposit amount, what it covers and the refund terms.
- The receipt for the deposit and the payment method.
- Any cooling-off cancellation notice given for sales made at the home.
- Proof of the special order, such as the supplier confirmation, in case a refund is disputed.
- The final invoice showing the deposit credited.
Review the policy once a year with your office manager. If deposits regularly cause friction on a job type, the trigger or the explanation probably needs to change.
Frequently asked questions
Can I take a deposit for a service call?
Most shops do not, and in states that regulate home improvement deposits a deposit should be tied to a signed contract. A clear service call fee charged at the visit is a different thing from a deposit.
What if the special-order unit costs more than the deposit limit?
You still cannot exceed the limit where one applies. Use progress payments, order after signing with supplier terms, or ask the customer to buy the unit directly.
Does the three-day cooling-off rule apply to emergency repairs?
The FTC rule excludes sales needed to meet an emergency and repairs the customer asked you to come and do. Extra products or services sold at the home can still be covered.
How quickly should I refund a cancelled deposit?
Follow your contract and state law. Under the FTC Cooling-Off Rule, covered cancellations must be refunded within 10 days.
References
U.S. Bureau of Labor Statistics (2015-2025). Business Employment Dynamics: Establishment survival, Construction (Table 7) (opens in a new tab) โ
Contractors State License Board (California) (2024). Terms of Agreement: A Consumer Guide to Home Improvement Contracts (opens in a new tab) โ
Maryland Home Improvement Commission, Maryland Department of Labor (2026). Maryland Home Improvement Contracts (opens in a new tab) โ
Federal Trade Commission, Consumer Advice (2025). Buyer's Remorse: The FTC's Cooling-Off Rule May Help (opens in a new tab) โ
U.S. Census Bureau (2023). County Business Patterns 2023, U.S. national file (cbp23us) (opens in a new tab) โ