Calling 811 before digging: rules for plumbers

How the 811 process works for plumbing digs, what the marks mean, why private lines are not marked, tolerance zones, and a ticket checklist for the office.

AssistCall research teamPublished Reviewed by Faruque Amin, VP of Sales and Marketing7 min read

On this page
  1. Why the call matters more than the paperwork
  2. The five steps, applied to a plumbing job
  3. Reading the marks
  4. Private lines: the gap that catches plumbers
  5. Sewer cross bores: the risk inside the pipe
  6. What OSHA adds for employers
  7. What to say when the customer wants it dug today
  8. Make the office own the ticket
  9. Frequently asked questions
  10. References
Licensing compliance: Calling 811 before digging: rules for plumbersArticle coverLICENSING COMPLIANCECalling 811 beforedigging: rules forplumbersAva for PlumbersInsightsLicensing compliance: Calling 811 before digging: rules for plumbersArticle coverLICENSING COMPLIANCECalling 811 beforedigging: rules forplumbersAva for Plumbers

Key takeaways

  • Failure to notify 811 before digging contributed to about a quarter of reported damages to buried utilities.
  • The process has five steps: notify, wait, confirm every utility responded, respect the marks and dig carefully.
  • 811 locators mark utility-owned lines; private lines such as sewer laterals, irrigation and lines to outbuildings usually need a private locator.
  • OSHA also requires employers to find utility locations before excavation and expose them by safe means as the dig gets close.

Why the call matters more than the paperwork

811 is the national number for underground utility locates, designated by the Federal Communications Commission in 2005[1]. Each state runs a one-call center that takes the request and sends it to the utilities with lines in the area. The call is free, and in most states it is required by law before mechanized digging.

Skipping it is still common. A 2025 Senate resolution citing industry damage data said failure to notify 811 before digging contributed to 26 percent of damages to buried utilities[1]. For a plumbing company, one damaged gas service or fiber line can mean an evacuation, an injury, a repair bill and a lost customer. Specialty trade contractors already recorded 608 fatal work injuries in 2024[2], and striking a live gas or electric line is one of the ways a routine dig becomes one of them.

Share of buried utility damages where failure to notify 811 contributedAs cited in a 2025 U.S. Senate resolution designating National Safe Digging Month.
Share of buried utility damages where failure to notify 811 contributedDonut chart. Failure to notify 811 contributed: 26%.Failure to notify 811 contributed: 26%26%
  • Failure to notify 811 contributed 26%

Source: U.S. Congress (Congressional Record), 2025[1]

Show the data
ItemValue
Failure to notify 811 contributed26%

The five steps, applied to a plumbing job

The 811 program describes the same five steps in every state[3]. Here is how they fit into a sewer, water service or drain tile job.

  1. Notify

    Call 811 or submit online through your state's center a few business days before the dig. Give the exact address, the area you will dig, the depth and the method, and pre-mark the dig area if your state asks for white paint or flags.

  2. Wait

    Utilities send locators to mark their lines. The response time is set by state law, so the office should know your state's wait period and never schedule a dig before it ends.

  3. Confirm

    Check the ticket status and make sure every utility listed has responded, either with marks or a clear 'no conflict' before anyone breaks ground.

  4. Respect the marks

    Dig carefully around the marks, not on them. The marks show the approximate location, not the exact depth or path.

  5. Dig carefully

    Some lines are shallow. Hand dig or use vacuum excavation inside the tolerance zone, and expose the line before bringing a machine close.

Treat the ticket like a permit. If the ticket expires, the dig area changes or the marks are destroyed, call for a new or updated ticket before continuing.

Reading the marks

Locators mark lines with colored paint, flags or stakes. The 811 program's own guidance gives gas as yellow[3], and the rest of the industry color code is printed on most locate tickets and state one-call websites. Teach every tech the colors and keep a laminated card in each van.

Common utility marking colors used on locate tickets; confirm with your state one-call center.
ColorWhat it marksPlumbing note
RedElectric power lines, cables, conduitOften shallow at service drops and yard lights
YellowGas, oil, steam, petroleumWatch for gas services crossing sewer laterals
OrangeCommunications, cable TV, fiberFiber strikes are expensive even when nobody is hurt
BluePotable waterYour own line on a water service job
GreenSewer and drain linesPublic side only in most places
PurpleReclaimed water, irrigation, slurryCommon in arid regions
WhiteProposed excavationYour pre-marks of the dig area
PinkTemporary survey markingsNot a utility line

The marks show where the locator thinks the line runs on the surface. Depth is not marked, and lines can bend between marks. That is why state laws set a tolerance zone, a set number of inches on each side of the marks, inside which only careful hand digging or other non-damaging methods are allowed. The width varies by state, so print your state's figure on the same card as the colors.

Private lines: the gap that catches plumbers

The 811 system sends tickets to utility owners. They mark what they own, which usually stops at the meter or the property line. Everything the property owner owns is invisible to the locate, and plumbing jobs are full of private lines.

  • The private side of the sewer lateral, from the house to the city connection.
  • Gas lines from the meter to a detached garage, pool heater, grill or generator.
  • Electric lines to outbuildings, pool equipment, landscape lighting or a well pump.
  • Irrigation mains and valves, invisible pet fences and low-voltage wiring.
  • Old abandoned lines that nobody remembers, including tanks and septic components.

Ask the homeowner about outbuildings, pools, generators and yard lights before the dig, and use a private locating service or your own locator and camera where you suspect private lines. Write down what you asked and what they said. If a private line is damaged, that note is the difference between a reasonable accident and a negligence claim.

Sewer cross bores: the risk inside the pipe

Plumbers face one hazard that diggers do not: a gas line bored straight through a sewer lateral during trenchless installation, called a cross bore. When the sewer later backs up, a drain cleaner can cut into the gas line with a cable machine. Many gas utilities now run cross bore inspection programs, and some ask plumbers to call before clearing a main line blockage in neighborhoods where they have bored gas services.

  • Camera the line before using a cutting head when the blockage is near the street and the area has newer gas services.
  • If the camera shows a pipe running through the sewer, stop, leave the line as it is and call the gas utility's emergency number.
  • If you smell gas after clearing a line, evacuate, call 911 and the gas utility from a safe distance, and do not operate switches or equipment.

What OSHA adds for employers

State one-call laws are not the only rule. OSHA's excavation standard requires the employer to determine the estimated location of utility installations before opening an excavation, to contact the utility owners, and, as the dig approaches the estimated location, to find the exact location by safe and acceptable means[4]. Exposed lines must be protected, supported or removed as needed.

So a locate ticket alone does not cover you. If your crew uses a mini excavator right on top of a mark, the ticket shows you called, but the OSHA rule asks whether you exposed the line safely before the machine got there. Combine both habits and write them into your trenching procedures.

What to say when the customer wants it dug today

The hardest moment is not in the yard. It is on the phone, when a customer with sewage in the basement wants the line dug up right now and hears that you need to wait for locates. A clear, calm explanation keeps the job and keeps you inside the law.

  • 'We can get your drains working today with a camera and cleaning. Digging is the next step, and before anyone digs, the law requires us to have the utility lines in your yard marked.'
  • 'The marking is free and the utilities come out within a few business days. We submit the request for you today and book the dig for the first morning we are allowed.'
  • 'If this turns into a true emergency, there is an emergency locate process, and we will use it. We will not dig blind next to your gas line.'
  • 'While we wait, can you tell us about anything else buried in the yard, such as a pool, generator, yard lights or a sprinkler system? Those are not marked by the utilities.'

Most customers accept the wait once they hear that the problem will be relieved today and that the delay protects their own home. Record the conversation in the job notes, including what the customer told you about private lines, so the crew has it in hand when the marks are down.

Make the office own the ticket

Locate failures usually start in scheduling, not in the field. A dispatcher books an emergency sewer replacement for tomorrow, nobody calls 811, and the crew shows up with an excavator and no marks. Put the ticket in the office workflow.

  1. Any job with digging gets a required 'locate ticket number' field before it can be scheduled.
  2. The scheduler checks the state wait period and books the dig only after it ends.
  3. The ticket number, its expiration date and the positive response status go on the work order.
  4. For true emergencies, follow your state's emergency locate procedure and note the reason.
  5. The crew photographs the marks before digging and attaches the photos to the job.

Example: a homeowner calls on a Monday with a collapsed sewer lateral and asks for a replacement 'as soon as possible'. The office explains the wait period, books a camera inspection and temporary relief the same day, submits the locate ticket that afternoon, and schedules the excavation for the first morning after the wait period ends. The customer gets a clear timeline and the crew arrives to a fully marked yard.

Frequently asked questions

Do plumbers have to call 811 for a hand-dug hole?

It depends on your state's one-call law, which sets the depth and method that require a ticket. Many states require a ticket for most digging, and calling is the safe default for any dig near utilities.

Will 811 mark the sewer lateral or gas line to a detached garage?

Usually not. Locators mark lines owned by the utilities that receive the ticket. Private lines owned by the property owner generally need a private locating service.

How long do I have to wait after calling 811?

Utilities typically have a few business days to respond, and the exact wait period is set by state law. Confirm that every utility on the ticket has responded before you dig.

Does a locate ticket satisfy OSHA?

Not entirely. OSHA also requires employers to determine utility locations before excavation and to find the exact location by safe and acceptable means as digging approaches them.

References

  1. U.S. Congress (Congressional Record) (2025). Congressional Record, Senate, April 7, 2025: resolution designating April 2025 as National Safe Digging Month (opens in a new tab) โ†‘

  2. U.S. Bureau of Labor Statistics (2024). Industries at a Glance: Specialty Trade Contractors (NAICS 238) (opens in a new tab) โ†‘

  3. Common Ground Alliance (811 Before You Dig) (2026). Before You Dig (opens in a new tab) โ†‘

  4. Legal Information Institute, Cornell Law School (Code of Federal Regulations) (2026). 29 CFR 1926.651 - Specific excavation requirements (opens in a new tab) โ†‘