Dispatch scheduling

Plumbing technician utilization rate and how to raise it

What technician utilization rate means for a plumbing shop, how to calculate it, what drags it down and the levers that raise it without burning out techs.

AssistCall research teamPublished Reviewed by Faruque Amin, VP of Sales and Marketing6 min read

On this page
  1. What the number means
  2. What counts
  3. Why it matters to the bottom line
  4. A worked calculation
  5. Getting the data without a timesheet fight
  6. What drags utilization down
  7. Levers that raise it
  8. How high is too high?
  9. Utilization, productivity and efficiency
  10. Tracking it fairly
  11. Talking to techs about it
  12. Example: one lever at a time
  13. Frequently asked questions
  14. References
Dispatch scheduling: Plumbing technician utilization rate and how to raise itArticle coverDISPATCH SCHEDULINGPlumbing technicianutilization rate andhow to raise itAva for PlumbersInsightsDispatch scheduling: Plumbing technician utilization rate and how to raise itArticle coverDISPATCH SCHEDULINGPlumbing technicianutilization rate andhow to raise itAva for Plumbers

Key takeaways

  • Utilization is billable hours divided by paid hours; define both precisely before you measure.
  • Drive time, parts runs, return trips and not-home visits are the usual leaks.
  • Payroll was about 27% of receipts at plumbing, heating and AC contractors in 2022[1], so idle paid hours hit margins directly.
  • Raise utilization by fixing the schedule and the warehouse, not by pushing techs to work faster.

What the number means

Technician utilization rate is the share of a tech's paid time spent on billable work. The simplest version is billable hours divided by paid hours for the same period. A tech paid for 40 hours who logs 26 billable hours has a utilization rate of 65% for the week, in this example.

The hard part is agreeing what counts as billable. Some shops count all on-site time at customer jobs. Others count only time that appears on an invoice, which excludes free callbacks and warranty work. Either definition is fine as long as it is written down and used the same way every month. Mixing them is how two managers end up arguing about the same tech's numbers.

What counts

Example: a utilization definition for a residential service shop
Time categoryBillable?Notes
On-site work on paid jobsYesArrival to completion
Diagnostic visits that are invoicedYesEven if the customer declines the repair
Free callbacks and warranty workNo, under a strict definitionTrack separately; it is a quality cost
Drive time between jobsNoUnless you bill travel explicitly
Supply house runsNoA sign of stock or staging gaps
Huddle, loading, restockingNoNecessary, but plan it tightly
Training and ride-alongsNoPlan it; do not let it hide inside other categories
Not-home and could-not-access visitsNoUnless a trip fee was charged

Why it matters to the bottom line

Labor is one of the largest costs a plumbing shop carries. Census data shows payroll equalled about 27% of receipts at plumbing, heating and AC contractors in 2022[1], and that is before benefits and payroll taxes.

Payroll as a share of receipts, plumbing, heating and AC contractors, 2022Census Statistics of US Businesses: $82.2 billion payroll on $306.3 billion receipts.
Payroll as a share of receipts, plumbing, heating and AC contractors, 2022Donut chart. Payroll: 26.9%; All other costs and margin: 73.1%.Payroll: 26.9%All other costs and margin: 73.1%26.9% payroll
  • Payroll 26.9%
  • All other costs and margin 73.1%

Source: U.S. Census Bureau, 2022[1]

Show the data
ComponentShare of receipts (%)
Payroll26.9%
All other costs and margin73.1%

Every paid hour is getting more expensive, too. Average hourly earnings at plumbing, heating and AC contractors reached $42.38 in September 2026 (preliminary)[2], and across private industry employers paid an average $46.89 per hour worked in total compensation in June 2026[3]. An hour of a tech's day that produces no invoice still costs that much. Raising utilization by a few points is often worth more than a price increase, because it adds revenue without adding cost.

A worked calculation

Example (fictional): over four weeks, a service tech is paid for 168 hours. The time log shows 101 hours on invoiced jobs, 9 hours on free callbacks, 31 hours driving, 7 hours at supply houses, 12 hours in huddles, loading and restocking, 4 hours of training and 4 hours at not-home visits.

Example, continued: utilization under the strict definition is 101 divided by 168, or about 60%. Including callbacks, it is 110 divided by 168, about 65%. The difference, 9 hours, is a quality signal. The biggest non-billable block is driving at 31 hours, about 18% of paid time, followed by loading and huddles. Those two categories are where this tech's utilization can grow.

Getting the data without a timesheet fight

You probably have most of the data already. Field service apps record when a tech taps en route, arrived and completed; GPS logs show drive time and stops; payroll shows paid hours. Combine them monthly rather than asking techs to fill in new forms.

  • Billable time: arrived-to-completed on invoiced jobs, from the field app.
  • Callback and warranty time: the same, for jobs flagged as callbacks.
  • Drive time: en route to arrived, or GPS trip time between stops.
  • Supply house and other stops: from GPS, categorized by location.
  • Paid hours: from payroll, including overtime.

The gap between paid hours and everything you can categorize is 'unaccounted' time. If it is large, fix the data habits first, usually techs forgetting to tap status buttons, before drawing conclusions about anyone's day.

What drags utilization down

  • Drive time: a scattered board, jobs booked outside zone days, emergency inserts across the map.
  • Parts runs: missing truck stock, parts not staged the day before, wrong parts ordered.
  • Return trips: second visits for parts or a more experienced tech, which repeat the drive and setup.
  • Callbacks: free return visits for the same problem.
  • Not-home visits: customers who forgot, tenants not told, gates locked.
  • Slow starts: late huddles, slow loading, techs waiting for their first job.
  • Paperwork at the end of the day that could be done on site in the field app.
  • Gaps in the board: cancellations that are never refilled.

Notice that almost none of these are about how fast the tech works. Most are scheduling, warehouse and office problems.

Levers that raise it

  1. Cut drive time

    Book routine work by zone and use the live map to send the closest qualified tech to emergencies.

  2. Set honest job durations

    Book from your own job history so jobs fit their slots and the day does not collapse into overtime and gaps.

  3. Stage parts the day before

    Pull job-specific parts and reserve water heaters when jobs are booked.

  4. Prevent return trips

    Ask the right intake questions, request photos and match tech skill to the job.

  5. Confirm appointments

    Day-before confirmations and on-my-way texts cut not-home visits and catch cancellations early.

  6. Refill freed slots

    Keep a list of customers who want an earlier time and text them when a slot opens.

  7. Release the emergency reserve on time

    Unused reserve capacity goes to routine work at a fixed time each day.

  8. Move paperwork into the job

    Photos, notes and invoices done on site, not at the shop at 5 p.m.

How high is too high?

There is no single right number, and you will see many quoted targets with no source. Build your own baseline by tech and by job type, and work on the trend. Treat very high utilization with care. A tech who is billable almost every paid minute has no time to restock properly, no slack for an emergency and no room for training, and that usually shows up later as callbacks, injuries or a resignation.

Training time is a deliberate drag worth keeping. Plumbing apprentices typically receive about 2,000 hours of paid on-the-job training a year, plus technical instruction[4]. Their utilization will be lower while they learn, and that is an investment, not a problem.

Utilization, productivity and efficiency

These three are easy to confuse. Utilization asks how much paid time is billable. Productivity asks how much revenue or how many completed jobs each tech produces per day. Efficiency compares actual job time with your time standard. A tech can be highly utilized but low in productivity (long, low-value jobs), or efficient but under-utilized (fast on jobs, but stuck in traffic between them). Look at all three together before drawing conclusions.

Tracking it fairly

Utilization by tech is useful for coaching, but it reflects the schedule as much as the tech. A tech who gets the far zone every Friday will always look worse than one who works the dense core. Compare techs only on similar work, share numbers privately, and use the categories to find causes rather than to rank people. Ask techs what costs them the most time; they usually know.

Review shop-wide utilization monthly and by tech quarterly, alongside capacity planning and CSR booking rate. Booking rate decides how full the board can get; utilization shows how much of that full board turns into billable time.

Talking to techs about it

Techs often hear 'utilization' as 'work faster'. Head that off by explaining the categories and showing that most of the gains come from the office: better booking, staged parts, fewer wasted trips. Invite techs to name the biggest time sinks in their week, and act on at least one suggestion quickly so the conversation is credible. If you pay incentives, tie them to outcomes the tech controls, such as first-time fix or callbacks, rather than to raw utilization, which the schedule largely decides.

Example: one lever at a time

Example (fictional): a shop finds its biggest drag is supply house runs, averaging over an hour per tech per day. It builds a standard truck stock list, stages job-specific parts each afternoon and records every run with a reason. Within two months, supply house time falls by about half, and the recovered time goes straight into an extra slot on most days. The shop then turns to drive time, using zone days for routine work, and repeats the process.

Frequently asked questions

How do you calculate technician utilization rate?

Divide billable hours by paid hours for the same period. Decide in advance whether free callbacks and warranty work count as billable, and use the same definition every month.

What is a good utilization rate for plumbing technicians?

There is no reliable public benchmark for plumbing. Set your own baseline by tech and job type, improve the trend and be wary of numbers so high they leave no time for restocking, training or emergencies.

What lowers technician utilization the most?

Usually drive time, parts runs, return trips, not-home visits and slow starts, which are mostly scheduling and warehouse problems rather than tech speed.

Is drive time billable?

Only if you bill travel explicitly. Most residential shops treat it as non-billable and reduce it through zone booking and routing.

References

  1. U.S. Census Bureau (2022). Statistics of U.S. Businesses 2022: U.S. and states, 6-digit NAICS (opens in a new tab) โ†‘

  2. U.S. Bureau of Labor Statistics, Current Employment Statistics (2026). Average hourly earnings of all employees, plumbing, heating, and air-conditioning contractors, not seasonally adjusted (CEU2023822003) (opens in a new tab) โ†‘

  3. U.S. Bureau of Labor Statistics (2026). Employer Costs for Employee Compensation - June 2026 (opens in a new tab) โ†‘

  4. U.S. Bureau of Labor Statistics (2025). Occupational Outlook Handbook: Plumbers, Pipefitters, and Steamfitters (opens in a new tab) โ†‘