- Start every commercial PM contract with an asset inventory; scope, frequency and price all follow from it.
- Define response levels in hours and in plain words, and say what happens outside them.
- Water safety raises the stakes in buildings with complex systems: CDC says about 1 in 10 people who get Legionnaires' disease die, and about 1 in 4 who get it during a healthcare facility stay[1].
- Reporting is the product facility managers renew for: a visit log, findings with photos, and a recommended-work list with priorities.
What a commercial PM contract is for
A commercial preventive maintenance contract turns a building's plumbing from a series of emergencies into a schedule. For the facility manager it means fewer shutdowns, documented compliance tasks and a predictable budget line. For the plumbing contractor it means recurring revenue, planned labor that fills slow weeks, and first call on the repairs the visits uncover.
Contracts fail when the scope is vague. 'Quarterly plumbing maintenance' means nothing until both sides agree what gets inspected, cleaned, tested and reported, on which assets, and what is excluded. The work below follows the order you should use to build one: inventory, tasks and frequency, response levels, reporting, then terms.
Step one: the asset inventory
Walk the building with the facility manager before quoting. Record every asset that will be covered, with location, make, model, size and condition. Photograph each one and give it an ID that will appear on every report.
- Water heaters and boilers serving domestic hot water, mixing valves and recirculation pumps.
- Backflow prevention assemblies, with their test due dates under local rules.
- Grease interceptors and traps in kitchens, with capacity and current pumping schedule.
- Sewer and storm laterals, cleanouts and any known problem lines.
- Restroom fixtures by count and type: flush valves, faucets, urinals, floor drains.
- Sump, sewage ejector and booster pumps, with alarms.
- Emergency fixtures such as eyewash stations and safety showers, where the client wants them included.
- Shut-off valves by zone, which are often unlabeled and seized in older buildings.
The inventory is also a sales tool. Facility managers inherit buildings without records, and a labeled, photographed list of their own assets is something many have never had.
Step two: tasks and frequency
| Asset | Typical tasks | Frequency to agree | Report item |
|---|---|---|---|
| Water heaters | Flush, anode check, relief valve test, temperature check at source and outlets | Quarterly to annually by type and water quality | Temperatures, condition, recommended work |
| Backflow assemblies | Test and certify | As required by the local water authority | Test report filed with authority |
| Grease interceptors | Inspect, measure, coordinate pumping | Monthly to quarterly by kitchen volume | Depth readings and pump-out record |
| Sewer lines | Camera inspection, jetting of known problem lines | Annually or semi-annually | Video file and findings |
| Restroom fixtures | Flush valve rebuilds, faucet aerators, leak check | Quarterly | Fixture list with action taken |
| Pumps and ejectors | Run test, alarm test, float check | Quarterly | Test results |
| Shut-off valves | Exercise and label | Annually | Valve map updates |
Avoid promising frequencies you can't staff. A quarterly schedule across ten buildings is forty visits a year, plus reporting time. Map the visits onto your calendar before you sign and leave room for the emergencies those same clients will call about.
Water safety and Legionella
Commercial buildings, especially hotels, senior living, healthcare and large offices, have complex water systems with dead legs, storage tanks and long runs where water stagnates. CDC says Legionella grows in building water systems such as showerheads, sink faucets, hot tubs and large, complex plumbing systems, at temperatures of 77-113 F, and that people 50 or older are among those at increased risk[2].
Source: Centers for Disease Control and Prevention, 2026[1]
Show the data
| Item | Value |
|---|---|
| All cases (about 1 in 10) | 10% |
| Cases acquired during a healthcare stay (about 1 in 4) | 25% |
The consequences are severe: about 1 in 10 people who get Legionnaires' disease die from complications, and about 1 in 4 of those who get it during a healthcare facility stay[1]. A plumbing contractor is not usually the owner of a building's water management program, but your PM visits can support one: recording hot water temperatures at the heater and at distant outlets, flushing low-use fixtures on a schedule, and flagging dead legs and failed mixing valves.
Drinking water quality is the other concern. EPA says the maximum contaminant level goal for lead in drinking water is zero and that there is no safe level of exposure[3]. Any replacement parts you install in potable systems must meet the federal 'lead free' definition, a weighted average of 0.25% lead across wetted surfaces of pipes, fittings and fixtures[4]. Put both points in your scope so clients know you take them seriously.
Be clear about boundaries. If the client has a water management team or a water treatment vendor, define which tasks are yours, and route any suspected Legionella issue to the client's responsible person immediately.
Step three: response levels
Response levels are where commercial contracts are won and lost. Define them by impact, not by how the caller sounds, and state times in hours from the call being logged.
- Emergency: active flooding, sewage backup, no water to the building, or a life-safety issue. On site within a set number of hours, around the clock.
- Urgent: a restroom out of service, a water heater down, a leak contained by a shut-off. Same or next business day.
- Routine: dripping faucets, slow drains, planned replacements. Scheduled with the next PM visit or within a set number of business days.
- Outside contract: work on assets not in the inventory, which is quoted separately before it starts.
Agree how calls are logged and who on the client side can authorize work above an agreed limit, especially after hours. A contract that promises a two-hour emergency response but routes night calls to a voicemail box will not be renewed.
Step four: reporting
- A visit log per asset: date, tech, tasks done, readings.
- Findings with photos, ranked as safety, urgent, recommended or monitor.
- A recommended-work list with prices for approval, so the facility manager can budget.
- Compliance records filed where required, such as backflow test reports.
- A short quarterly summary: calls by response level, response times achieved, and spend against the agreed budget.
Facility managers report up to owners and finance teams. Give them a document they can forward unchanged, and they will see you as part of their team rather than a vendor.
Step five: contract terms
Scope and exclusions
Reference the asset inventory and task matrix as schedules. List exclusions such as concealed piping, code upgrades and owner-supplied equipment.
Pricing structure
A fixed fee for scheduled visits, a labor rate and parts markup for repairs, and how emergency calls are billed.
Change control
How assets are added or removed during the term, and how the fee adjusts.
Access and safety
Sign-in rules, escorts, lockout procedures, hot work permits and any site-specific training.
Insurance and documentation
Certificates, license numbers and any background checks the client requires.
Term and renewal
Typically one year with a renewal review meeting 60 days before the end, based on the quarterly summaries.
How to win the first contract
Most commercial PM contracts start with a repair. A facility manager calls about a backed-up restroom or a failed water heater, you fix it well, and the follow-up conversation is where the contract begins. Prepare for that moment instead of waiting for a formal tender.
- Leave a short findings note after every commercial repair: what failed, why, and two or three other risks the tech noticed in the plant room.
- Offer a paid or no-charge asset walk, your choice, with the inventory as the deliverable. It shows how you work before any contract is discussed.
- Ask what the facility manager reports to their owner and design your quarterly summary around it.
- Propose a first-year scope that is smaller than the ideal one, such as water heaters and backflow only, then expand at renewal with evidence from your reports.
- Bring references from similar buildings and be specific about your after-hours coverage.
Price the contract from the task matrix: technician hours per visit, travel, reporting time and expected parts, plus a margin for the call-outs the contract will generate. If the numbers only work at a frequency the building does not need, say so rather than padding the visits.
Example: a three-building office portfolio
Example (fictional): a commercial plumbing contractor bids a PM contract for three mid-rise office buildings owned by one landlord. The asset walk finds 11 water heaters, 6 backflow assemblies, 140 restroom fixtures, 2 sewage ejectors and dozens of unlabeled shut-offs. The contractor proposes quarterly visits, annual camera inspection of two problem laterals, and a valve-labeling project in the first quarter.
In year one the visits find a failed mixing valve sending water hotter than set to one floor, a backflow assembly due for replacement and a seized main valve that could not be closed in an emergency. Each finding goes on the recommended-work list with photos. At renewal, the quarterly summaries show every emergency call met its response time, and the landlord adds a fourth building.
Before you sign
Check that the contract works financially at the frequency you promised, that your team can staff the response levels at night, and that the client understands what is excluded. For the sales side, see the 30-day sales training plan and the guide to why estimates don't close. If you bid public or institutional work, a clear capability statement helps you get on the list.
Frequently asked questions
What should a commercial plumbing maintenance contract include?
An asset inventory, a task and frequency schedule, response level definitions, reporting requirements, pricing for visits and repairs, change control, access and safety rules, insurance, and term and renewal.
How often should commercial water heaters be serviced?
It depends on the heater type, water quality, use and the manufacturer's instructions. Many contracts set quarterly to annual service; agree the frequency with the client and record temperatures at each visit.
Is a plumber responsible for Legionella control?
Usually the building owner is responsible for a water management program. A plumbing contractor can support it with temperature checks, flushing and fixing dead legs, but the contract should define those tasks clearly.
What response time should a commercial plumbing contract promise?
Only what you can staff around the clock. Define emergency, urgent and routine levels by impact and state times in hours from when the call is logged.
References
Centers for Disease Control and Prevention (2026). About Legionnaires' Disease (opens in a new tab) โ
Centers for Disease Control and Prevention (2026). Causes and How Legionella Spreads (opens in a new tab) โ
U.S. Environmental Protection Agency (2026). Basic Information about Lead in Drinking Water (opens in a new tab) โ
U.S. Environmental Protection Agency (2026). Use of Lead Free Pipes, Fittings, Fixtures, Solder and Flux for Drinking Water (opens in a new tab) โ