Hiring training

Four-day work weeks for plumbing techs

Four-day work weeks for plumbing techs compared: 4x10 coverage math, overtime rules, pros and cons, and a 90-day pilot plan for service departments.

AssistCall research teamPublished Reviewed by Faruque Amin, VP of Sales and Marketing7 min read

On this page
  1. What a four-day week means in plumbing
  2. Overtime and pay
  3. The coverage math
  4. Using the longer day and Saturdays
  5. Pros and cons
  6. Keeping long days safe
  7. On-call under a four-day week
  8. Seasonality
  9. Is it right for your shop?
  10. A 90-day pilot
  11. Example: a staggered pilot
  12. Frequently asked questions
  13. References
Hiring training: Four-day work weeks for plumbing techsArticle coverHIRING TRAININGFour-day work weeks forplumbing techsAva for PlumbersInsightsHiring training: Four-day work weeks for plumbing techsArticle coverHIRING TRAININGFour-day work weeksfor plumbing techsAva for Plumbers

Key takeaways

  • A 4x10 schedule keeps 40 hours a week, so federal overtime is not triggered because it is calculated per workweek over 40; some states add daily rules[1].
  • Staggered crews are the key: with three groups on different four-day patterns, a shop can cover five days with longer daily windows.
  • Only 30.3% of employed people work on an average weekend day or holiday versus 80.5% on weekdays, so a crew that works Saturdays reaches customers who are home[2].
  • The main risks are fatigue on 10-hour days, thin coverage on some days and the office schedule; plan for each.
  • Pilot in the slower season with clear measures, not across the whole company at once.

What a four-day week means in plumbing

In most plumbing shops a four-day week means four ten-hour days, often called 4x10, with the same 40 hours as a five-day week. A smaller number of companies try a reduced week, such as four eight-hour days, but that cuts capacity and pay unless productivity rises a lot, so it is rare in service work. This article focuses on 4x10.

BLS notes most plumbers work full time and that nights and weekends are common, with techs often on call for emergencies[3]. Any schedule change has to fit around that reality. A four-day week does not remove on-call duty; it changes who is available on which days.

Overtime and pay

Under federal law, overtime is due at one and one-half times the regular rate for hours over 40 in a workweek[1]. A tech who works four ten-hour days has worked 40 hours, so no federal overtime is due for those days. Some states calculate overtime daily, for example after eight hours in a day, and allow compressed schedules only with specific procedures. Check your state's rules before announcing anything.

On-call work on a tech's day off, or a long emergency call at the end of a ten-hour day, can push the week past 40 hours. Model a few realistic weeks, including on-call, before you decide.

The coverage math

The fear with 4x10 is that a shop will be short on some days. The fix is staggering. Instead of everyone taking Friday off, split the team into groups with different days off. Example: a shop with 12 service techs moves from five eight-hour days for everyone to three groups of four techs on ten-hour days.

Example: Group A works Monday to Thursday, Group B Tuesday to Friday, Group C Monday, Tuesday, Thursday and Friday
DayFive-day schedule: techs on shift4x10 staggered: techs on shiftFive-day tech-hours4x10 tech-hours
Monday128 (groups A and C)9680
Tuesday1212 (A, B and C)96120
Wednesday128 (A and B)9680
Thursday1212 (A, B and C)96120
Friday128 (B and C)9680
Week total60 shifts48 shifts480480

Example takeaway: weekly capacity is unchanged at 480 tech-hours, but the daily pattern changes. Fewer techs are on shift on three days, while each tech is available for a longer window, such as 7 a.m. to 5:30 p.m. That longer window lets you offer early and late appointments and finish more installs in a single day. If your call volume peaks on Mondays, put more techs on Monday.

Using the longer day and Saturdays

A ten-hour shift lets you offer appointment windows before and after normal working hours, which suits customers who cannot take time off. Weekends offer a similar opening. On an average Saturday, Sunday or holiday in 2025, 30.3% of employed people worked, compared with 80.5% on an average weekday[2]. A group working Tuesday to Saturday reaches homeowners on the day they are most likely to be home.

Share of employed people who worked on an average day, 2025
Share of employed people who worked on an average day, 2025Comparison. Weekday: 80.5%; Saturday, Sunday or holiday: 30.3%.80.5%WeekdayWeekday: 80.5%30.3%Saturday, Sunday or holidaySaturday, Sunday or holiday: 30.3%Share of employed people who worked on an average day, 2025Comparison. Weekday: 80.5%; Saturday, Sunday or holiday: 30.3%.80.5%WeekdayWeekday: 80.5%30.3%Saturday, Sunday or holidaySaturday, Sunday or holiday: 30.3%

Source: U.S. Bureau of Labor Statistics, 2025[2]

Show the data
ItemValue
Weekday80.5%
Saturday, Sunday or holiday30.3%

Saturday crews need support: someone has to answer the phone, dispatch and handle parts. BLS notes customer service representatives often work evenings, weekends and holidays during busy times[4]. Plan the office schedule at the same time as the field schedule. You can also pair a compressed schedule with an SI Employee such as Ava answering and booking routine calls when the office is thin, with emergencies still escalated to the on-call tech.

Pros and cons

  • Pro: a strong recruiting message. A guaranteed three-day weekend stands out in job posts.
  • Pro: fewer commutes and fewer truck starts, which can save fuel and time.
  • Pro: longer days let crews finish a water heater swap or a small repipe without returning the next morning.
  • Pro: extended daily hours and optional Saturday crews make the company easier to book.
  • Con: fatigue. Ten hours in crawl spaces and attics is hard, and tired techs make more mistakes and have more accidents.
  • Con: thin days. Fewer techs on shift on some days can leave no capacity for a sudden surge.
  • Con: childcare and family schedules may not fit ten-hour days.
  • Con: customers who are used to a specific tech may have to wait for that tech's next working day.
  • Con: more complex scheduling and payroll, especially in states with daily overtime.

Keeping long days safe

Fatigue is the most serious risk of a ten-hour schedule in a physical trade. Build limits into the schedule rather than relying on techs to speak up when they are tired.

  • Schedule a real lunch break and two short breaks, and tell dispatch not to book over them.
  • Avoid putting two heavy jobs, such as water heater swaps or crawl space repipes, back to back late in a shift.
  • Limit on-call duty on the evening after a ten-hour day, or give the on-call tech a later start the next morning.
  • Keep the last hour of the shift for lighter calls, estimates or truck restocking where possible.
  • Ask about fatigue in ride-alongs and stay interviews, and track injuries and near misses by hour of the shift.

On-call under a four-day week

Decide how on-call fits before the pilot starts. Common approaches are to keep the existing weekly rotation regardless of days off, or to assign on-call only to techs whose regular days include the next morning, so a tech on call Thursday night is not also off Friday. Write the rule down, pay on-call fairly and make sure the escalation path is clear on every day of the week.

Seasonality

Plumbing, heating and AC contractor employment peaks in summer: about 1,305,900 people in January 2026 and 1,357,800 in August[5]. Your own call volume may peak in winter freezes, summer, or both. Some shops run 4x10 in the slower months and return to five days in the peak, others keep 4x10 all year and add Saturday crews in the busy season. Whatever you choose, publish the seasonal plan in advance so techs can plan around it.

Is it right for your shop?

  1. Do you have enough techs to stagger? With fewer than about six, a four-day week leaves some days nearly uncovered.
  2. Does your call volume have predictable peaks you can staff to?
  3. Can your office cover the longer daily window and any Saturday crews?
  4. Do your state's overtime rules allow it without extra cost?
  5. Do your techs want it? Ask before you plan, because some will prefer five shorter days.
  6. Can you protect safety on long days, with breaks and limits on back-to-back heavy jobs?

A 90-day pilot

  1. Measure the baseline

    Record three months of revenue per tech, callbacks, overtime hours, response times, injuries and customer reviews.

  2. Choose volunteers

    Start with one group of volunteers, not the whole team, and keep everyone else on the current schedule.

  3. Set the rules

    Daily hours, break times, on-call coverage, how days off are assigned and how the schedule changes in an emergency or a freeze.

  4. Run it in a slower season

    Pilot when volume is steady, not during the peak, so problems are visible but not overwhelming.

  5. Review monthly

    Compare results with the baseline and ask participants and dispatch what is working.

  6. Decide and communicate

    Expand, adjust or stop, and explain the decision with the numbers.

Example: a staggered pilot

Example (fictional): a 15-tech shop pilots 4x10 with six volunteers in spring, split into a Monday to Thursday group and a Tuesday to Friday group, with one Saturday rotation added for the Tuesday to Friday group. The office adds an early CSR shift to cover 7 a.m. calls.

Example (fictional) results after 90 days: revenue per tech is flat, installs finished in a single day rise and overtime falls slightly. Two volunteers report fatigue on heavy install days, so the shop limits back-to-back installs on ten-hour shifts. The owner expands the schedule to the rest of the team who want it, keeping five-day schedules for those who prefer them, and adds the option to job posts. Related reading: building a company culture plumbers want to join and promoting a tech to lead.

Frequently asked questions

Do four-day work weeks work for plumbing companies?

They can, if the shop has enough techs to stagger days off, the office can cover longer days and the state's overtime rules allow it. Pilot with volunteers in a slower season and measure revenue, callbacks, overtime and safety.

Is a 4x10 schedule overtime?

Not under federal law, which calculates overtime per workweek over 40 hours. Some states calculate overtime daily or have specific rules for compressed schedules, so check yours.

How do you cover five days with a four-day week?

Stagger groups with different days off, for example one group Monday to Thursday, one Tuesday to Friday and one with a midweek day off, and staff extra techs on your busiest days.

References

  1. U.S. Department of Labor, Wage and Hour Division (2019). Fact Sheet #56A: Overview of the Regular Rate of Pay Under the FLSA (opens in a new tab) โ†‘

  2. U.S. Bureau of Labor Statistics (2025). American Time Use Survey, Table 4: Employed persons working and time spent working on days worked, 2025 (opens in a new tab) โ†‘

  3. U.S. Bureau of Labor Statistics (2025). Occupational Outlook Handbook: Plumbers, Pipefitters, and Steamfitters (opens in a new tab) โ†‘

  4. U.S. Bureau of Labor Statistics (2025). Occupational Outlook Handbook: Customer Service Representatives (opens in a new tab) โ†‘

  5. U.S. Bureau of Labor Statistics, Current Employment Statistics (2026). All employees, plumbing, heating, and air-conditioning contractors, not seasonally adjusted (CEU2023822001) (opens in a new tab) โ†‘

Book a demo

See Ava handle your calls.

Book a short demo. Weโ€™ll walk through your calls and workflow, and agree what Ava should take care of.

Book a demo